Showing posts with label tulip. Show all posts
Showing posts with label tulip. Show all posts

Wednesday, October 16, 2013

YOP #15 or How Nothing Goes as Planned

It's been a busy week so far and this isn't even the week I'm going to write about.

Last week was also on the busy side. Lots of concerts at work though that equals lots of time to work on knitting. Last Sunday, the 6th, I picked up Fruity Tulips again. I've made an insane amount of progress on them this week. I had finished the cuff and the set-up for the leg (this would about the first 30 rounds). 

Here's a photo of it from yesterday morning, the 15th. 
Turns out that the pattern was much easier than I had remembered it to be. Once I got into the rhythm of it, I was speeding along my needles. Husband doesn't like how the color is knitting up. He calls it radio static. It's a good thing I'm making these socks for me then as I love the color. This is my Christmas yarn. Not only do I love the color, but I love how it feels to knit with it.

I also got Waves of Love off the needles. I completely screwed up the last row before the bind off, but I'm going to hope it still blocks alright. It's not officially finished yet because the ends aren't woven in and there's that whole blocking thing. I wasn't able to weave in the ends because I couldn't find a tapestry needle anywhere. I looked in the tool drawers and the little hippo pouch my youngest bonus daughter gave me for my birthday but I couldn't find it. Since I needed to go pick up a pattern to make a costume for Husband and I (it's a secret at this point; all will be revealed at the end of November), I figured I would also pick up some more tapestry needles.

Saturday we were suppose to have people come over and do crafts with us. I was going to work on the costume and other people were simply going to be around. On Friday, people started canceling. Things had come up, which I'm well aware of how that works. By the end of the day Friday, no one was able to make it. We ended up taking the dog to a dog park (I was in a foul mood and a bit grumpy knowing I had cleaned my craft room and the universe wasn't letting me see people) and spending time together before I had to head to church to run the lighting. That was fun because there had been a maintenance call that I couldn't make because of work. Turns out to be a good thing I was scheduled to serve this past weekend because I'm the fastest at programming. When I got home from church, I finally got fabric laid out to cut and I wasn't happy with how I was going to have to lay out the fabric. I finally figured out a way to get the right look (and create only a little extra work for myself) and pinned the first section of the pattern to the material. 

As it was now getting late, I decided to cast on the next pair of test socks I'm going to be working on. They're going to be called The Angels Have the Police Box because of the color work in the design and the colors I've picked. It's my  first time doing color work on socks. I pretended to do some stranded color work on my first pair of mittens (reminder: must start mittens soon; Winter is Coming) but this is the first time I've used an actual pattern. I got the cuff cast on and started the first cable row. I reached into my hippo bag to get a cable needle and what do I find? That's right. A tapestry needle. I swear the bugger wasn't there the day before! Once I got the first repeat of the pattern cuff done, I decided it was bedtime. 

Sunday, Husband and I went to see Wicked. He thought about bringing his cane to practice as we walked to the theatre. I told him that if he did that, I'd be bringing my knitting along. We both left the house without our toys. Sunday was also an exciting night because the next morning I was going to go to  my first ever knitting class with Ann Budd. More about the class in another entry but the most important thing I learned from that class (there were several) in regards to my year of projects is that I purl backwards. So that lovely sock I got so far on? I'll be frogging that sometime in the next day or so because I'm now twitchy knowing that I'm doing things wrong on it. (I decided to look up how to really do a yarn over and I do those wrong as well). I'm not going to frog Fuzzy or Waves of Love as one is nearly finished and one is off the needles and even closer to being finished, but I will be frogging the new test socks as well.

Finished Objects

Works in Progress



Wednesday, October 9, 2013

YOP #14 or I could taste the finish through the tears

Last week was insane.

I work at a concert hall, so we often have insane weeks. Last week was it's own special mix of amazing, heartbreaking and insane. Usually the insane weeks don't have me in tears.

We had two Musicians of the Minnesota Orchestra concerts scheduled, just past the year anniversary of the beginning of the lock-out. On October 1st, the same day our wonderful (/sarcasm) government shut down, Osmo Vanksa announced that he was resigning as the conductor of the Minnesota Orchestra, which is something he had threatened months ago if an agreement wasn't reached. By the end of the week, he was conducting his musicians for a farewell concert and we added a third concert. This turned into a media three-ring circus. On top of it all, the musicians were also honoring their long time stage manager who had retired last month. I still cry when watching All Dogs Go to Heaven, so there was no way I wasn't going to be crying at some point during these shows. Add into it everyone else crying and it was inevitable that I would be crying.

One thing that helped get through most of the concert (the last piece, the encore, was heartbreaking and entrancing and the only thing to do was to watch and listen to it) was that I had my knitting on hand. Knitting helps as  a way to focus on something mechanical to prevent emotions from overwhelming me. I had brought along Waves of Love in hopes that I would finish it. And I almost did. Why didn't I? Too much crying? Nope. I ran out of yarn with about 4 rows left. I had an extra skein at home, but that wasn't going to be of much help during the last piece of the printed program. Cursing myself for not planning ahead, I set the knitting down and somehow managed to get through the last of the concert with only a modest amount of crying.

After an exhausting weekend, I pretty much crashed when I got home. I insisted on driving to church the next morning, mostly because I didn't have a project on hand. Husband drove after church. There were some raw emotions. I was resigned to not being able to work on anything until I got the other skein caked, which I wasn't looking forward to as I didn't have a swift and I find it tedious to wind yarn without one.

Husband needed to go out and do something, anything. It was a rough day for him on Sunday for personal reasons and it was a rough one for me too. Sunday was my Gramps' birthday. He passed away in 2008. I've actually gotten "better" at not tearing up on his birthday but Husband greeted me Sunday morning by proclaiming "Happy Birthday" after I noted that our bedroom doors were up (he built them as a birthday/Christmas present). That pretty much broke my sleep deprived brain. When we headed out, he told me to grab my knitting, so I picked up the Fruity Tulips. Apparently my brain had decided that the pattern was much harder than it really is because once I got a few rows into it, I realize that I mostly have the pattern memorized on the leg. At least I know I have another travel project now! We ended up buying fabric for an outfit for Husband that we need to start work on this weekend. Still need to buy a pattern to modify but it's only Wednesday, right? Before the night was out, I did lock myself in my craft room and wind the second skein for Waves of Love in hopes of finishing it before the night was over but the finishing didn't happen. Maybe by the next update it will be done.

This mid-week updates tend to screw up my thoughts as to what I did during the "week" but I do know where I stopped on Sunday. The whole weekend was such a mess that it's taken me a few days to recover. This has somehow given me a good idea of where I had stopped for the week. Maybe next week their be something finished and pictures.

Finished Objects

Works in Progress

Tuesday, September 3, 2013

YOP # 9 or Bonding Time with Husband

I've made quite a bit of progress this week.  All of my projects from last week have grown. Unfortunately, that makes them harder to take with me as I walk places but that seems to have worked out this last week.

Husband realized that all of the James Bond movies were available to watch on Netflix. Up until this week, I'd seen one full Bond film, the most recent one, and had seen bits and pieces of others. I've never truly been drawn to the whole Bond thing but Husband wanted to share the movies with me. However, they were only streaming until September 2nd.

We only managed to get through one complete movie, Golden Eye, though I saw most of another one with Roger Moore...there were horses and Christopher Walken was the bad guy. I don't remember the title now but the opening sequence on skis was pretty fun. The best part was that I could sit there and knit.

Fuzzy is nearly 2 feet long now. I didn't take a picture but there has been some growth there. I still haven't decided if I'm going for a certain length or a certain number of skeins used for the project yet. I guess I'll see how big it is once I'm finished with the 3rd skein.

The Tulip socks have a cuff and the set-up for the leg pattern. Since there's a chart for the leg pattern and I don't know how complicated it is yet (I've glanced but not memorized it), I don't know if this is going to be a traveling project or not. I'd like my printed out sheets to stay pretty but they end up folded and beat up when I travel with them.

The camera on my phone and the lighting really don't do the colors any justice.

I also spent quite a bit of time on Waves. It was my travel project this last week but I think it has now earned stay at home status as well.

I was in the middle of a row and stopped for some reason but wanted the picture more than I wanted to finish the row. There are over 200 stitches on the needles right now.


To add to the fun, and to have something I am certain can travel easily, I've volunteered to test a pattern. Another pair of socks but they looked like fun and then I can add "pattern tester" to all my other abilities.

The goal for next week is to actually update this on Sunday...

Finished Objects

Works in Progress

Tuesday, August 27, 2013

YOP #8 or This is What Happens When I Must Start ALL the Projects NOW

After successfully being project monogamous for 3 weeks(!?!), my fingers were itching to play with new things.

First the oldest WIP:

Fuzzy


I've decided that the blankets name is Fuzzy. I have no logical reason other than the yarn is fuzzy. Part of me feels it's silly to name projects but on the other hand...I like it better than just a generic description.


Fuzzy is now 19 inches long! It's taken a lot of patience to get this much done. I have no idea what it will look like once blocked. I'm thrilled that the cables are reversible. I suppose I should take a picture of that as well....

I was a little worried that I wouldn't be happy with the new pattern but I'm thrilled with it! It's about 24" wide. So far, there are 2 skeins (3rd one is in progress) in the blanket. In the first version, most of 2 skeins only had me at about 5 inches high. I can either plan on using a total of 4 or 5 skeins. I'll probably just knit and make my decision as I go. Surely there becomes a point where a blanket is just too big, right?

Now onto the two newest wips....

Tulip Socks

My bonus kids bought me a lovely skein of yarn for Christmas. I started making one pair of socks out of it and decided the pattern just didn't work. I showed it to mom who agreed and suggested I make the Tulip socks from the April 2013 Cookie A Sock Club. I've not gotten very far on them, but they are started! I think I felt compelled to make these socks for two reason:

  1. I like that Husband got his kids to buy me yarn. I LOVE the yarn and I want them to see me using it and knowing that I love their gift and that it's just not sitting in a drawer gathering dust bunnies.
  2. Neither of the August sock patterns screamed MAKE ME.



Waves of Love

This is my first shawl and it's a gift. I'm absolutely loving the yarn. It's Filament o' Squid from Indigodragonfly and it is a dream to work with. I've never worked with sea cell yarn before but I could easily get addicted to this yarn! It's the June club shipment my mom got for us.

I'm going to need to switch to circular needles soon but it's been nice to bring out my straight needles. Mom gave them to me as a Christmas gift in 2011. I've only made a handful of things on them since I've been so sock crazy lately. Husband is still to blame/thank for my sincerely getting into knitting. Knitting gloves for his youngest inspired Mom to buy me these needles and I sort of got hooked. Then came sock knitting and it seems I've been swallowed up whole!


I think this coming week is going to be more of the same. Fuzzy is soon to be an "at home" project as it's getting to big to deal with knitting while walking outside in the ridiculous heat index right now (I believe it was suppose to feel like 105 degrees F today). The Tulip socks take pattern reading and marking right now, so that's another mostly at home project. At least the shawl has a fairly simple pattern right now, making it travel worthy.

Finished Objects

Works in Progress